Atrium is almost complete!

We have only one side of trim to put up and naturally paint. Then we will put up the railing and the atrium will be done! The painting of the ceiling/walls are done and the flooring is in. Remember off of the one atrium landing we will put in a door so we can walk into the attic above the garage. I want that done before next weekend, but I think Chad is on call, so that probably won’t happen as it will most likely be late nights for him. My “hope” was that it was done so we had an easier time to get all of the outside Halloween decorations down (as well as when we go to put them away) as we will not be doing ANY inside work once I have the inside Halloween decorations up. October is the only month that it is all outside stuff or very minimal inside work.

We will also put a ‘bridge’ between the two landings as Gamora likes to lay between them (found that out last year at Halloween as we put a drunken sailor skeleton on the bridge), now we have a prettier bridge to put up and then Gamora and the sailor can be happy.

This picture above is just showing the trim that we need to paint….

Leave a Comment