We did get the closet off the Harry Potter closet done (new light and paint) so it is all ready for the various holiday decorations to go back in, Yahoo! Chad unfortunately still gets service calls on Saturdays, leaving us only Sunday to really work. However, we were able to put in my new stove. I’m SUPER excited about this as there is only one meal a year I really like to cook and that is Thanksgiving. The old stove only had 1 burner that would work and 1 that if it was in a good mood, I guess would work. Well that IS NOT acceptable for a Thanksgiving meal. Now, don’t judge the kitchen as we have not started the remodel. This is a temporary fix to get the new stove in and the good thing – the burners all work! I’m new to the whole induction cooking so Thanksgiving could end up with Dominos pizza, but I’m excited all the same!
I can see and no more yellow/cream walls. My decorations will be happy here.Omg – I swear it is as old as the house.Temporary countertop and you can see the one line where we will cut to make the new hole for the stove.Happiness!
Well, I know it has been slow going as of late and the destruction is about to happen, but sometimes you have to do some little things so that you can destroy. We put together an armoire to store things that are currently in the open area (which eventually will find a permanent home) and storage for all things “pets”. This will allow us to really start to dig into the upstairs remodel without having to constantly move things from room to room.
We did also put new floor in the closet that is off of the Harry Potter closet….yes, there are 2 closets hiding there! We also took some time to go to the local corn maze and take in the new Addams Family movie – still need to have a little fun!
Ready to store the pet food and treats!New light and paint and this 2nd closet will be done!
Earlier in the week due to Hurricane Pamela, we received a lot of rain. Normally not an issue, but this week, it sounded like something was leaking during one of the rainstorms. Naturally, yes, something was, the chimney! Ok, now normally I would not be happy (still wasn’t) but this was something we knew we would be “fixing”. We knew the current fireplace definitely has not been taken care of and honestly in the month of October, would not be shocked if something scary came out of it. However, fixing a leaking chimney was not on the top of the priority list, suddenly this became priority #1. When Chad got to the top of the chimney to scope out the damage, come to find out that there was only chicken wire as a “cap” to the chimney. Well no wonder we had rain coming in. We were planning to change the wood-burning fireplace to electric. The fix is getting a new cap, flexed tapped the thing (like no other), installed and then repaired the cracked concrete on top of the chimney. Fingers crossed, no more rain coming down the chimney.
We had a lot of other things planned for the weekend, but only had Sunday to work as Saturday we were just getting started, Chad got called out for a service call to Corpus Christi – Ciera and I joined him for the ride, but as you can see – there was no way I would be getting on the roof to fix this problem. 🙂
Not sure this is safe, but why I keep good life insurance on him! LOL! Looking to see if Lowes had the cap we needed. Luckily they did. Prior cap – Chad forgot to take a pic with the chicken wire stuff on top – but you can see what it looked like on the sides towards the bottom.New cap that is getting SEALED!!!All Done!
Ok, so really the deal this weekend was that Chad had to work all day on Saturday (which always is a bummer) AND we have the AC people coming on Monday. This meant we didn’t want to start the upstairs destruction until the new AC is in. I cannot wait, and Ciera is super excited as her bedroom is upstairs. We decided to spend Sunday getting the outside Halloween decorations up and we went shopping for our next project – Ciera’s bathroom. Next weekend we will be back at it and ready to DESTROY the upstairs. So much fun! Happy 31-days of HALLOWEEN!
So, Chad having a real job again and him needing to spend some nights in Houston, kinda leaves projects on hold for the weekend. I messed up our Saturday “working” as I was tired of not having local channels, so had Dish Network here most of the day (I won’t go into that chaos)! All is good as it was up and running by Saturday evening so got to see most of the Husker game (yes, this is why we lost as I started watching – according to Ciera) and had my Red Zone for all the NFL action today. The new closet floor is in, trim is up and shelving is built. We just need to paint the trim and the shelving and we will have 1 more room completed! Yahoo!
shelving prep – painter’s tape is fabulous to figure out where you want your shelves.
So we should have completed the Harry Potter’s closet (tanning room), but had to take care of some outside work instead. Chad cut down a couple trees in the back and a whole bunch of bushes. We were going to make a run to local landfill to get rid of the debris but have two more trees to take down and thought the debris could sit for a week and then we could have one big load. Well, Rodney decided that was not going to be the plan. Rodney LOVES to hunt “critters” and well, one decided to come visit the back yard (thinking due to the debris) and Rodney made sure to let me know about that critter around 3am Saturday morning. I HATE critters – so change of plans. Below is what happens to a gutter if a critter is trying to get away from Rodney – he’ll just chew the gutter closed, good luck getting out! The picture below is after Chad pulled some of it apart, I’m shocked Rodney didn’t cut his mouth!. We now have a new partial gutter, guess that is a good thing? The debris – well that went to the landfill on Saturday.
We did get the closet textured and painted, so although not done, progress was still made.
Since Rodney is now involved in the process – above is Rodney!
Well I don’t know who would put a twin bed in a closet, but that is what we found when we closed. This is not under the stairs like Harry Potter, but I do feel bad for whoever had to call this closet a bed room. We got rid of the bed, tore out the carpet and decided this would make a perfect tanning bed room (at least I don’t sleep here). Before we tackled this project though, we put up a “temporary wall” in what I thought would become my office – heck it still might, but the room off of the Harry Potter closet is an open area that will either become the exercise room or my office – I need walls to decide exactly where my office will be. Until I get that decided, the temporary wall will give me some work privacy.
just some cheap paneling that will come down very easy for real walls or to remain open
Believe it or not, this closet had a closet (you can see in the pic with carpet), well we tore that out and because there is no power on the north wall, Chad ran the wiring – I’m all set to get a good tan (well once we get it painted and a new floor).
We finally finished the half bath and laundry. For the most part we got these done during the week, so we rewarded ourselves with a “chill” weekend – which meant hanging pictures, figuring out the next project and Chad starting to change all of the plug-ins and and light switches to white modern styles (the almond has to go!). Scroll down to see the before photos and here are the after. The laundry room will have a counter over the washer and dryer, but during the weekends I need to get laundry done, so Chad can do that on Monday. Wednesday he starts his new job, so I won’t have him working on things 24/7. He claims going to work will be a vacation – I don’t think I’m that bad. HA!
It is 8:40pm and FINALLY a load of laundry was able to be completed. Is the laundry room done, oh heck no…. why? Well, let’s just say there was a VERY low spot between the hall door going into the laundry room. We cheated with the 1/2 bath with the backer board, but that was not going to work here (check out the photo with the level). We had to come up with the next best thing – liquid level. The downside, well you have to let it dry before you can tile, so that delayed things. However, after a week of no laundry being done, work clothes were starting to get slim and did I really want Chad to use my towels? Ok, married forever, this should not be a big deal, well… it is! HA! So the washer and dryer are in, but not without 2 tiles “dying” along the way – so if you look close enough, 2 tiles need to come up this week. It’s all good – laundry is getting done. If you notice there are 2 hand weights in one of the pictures too. Trick to note – if it seems you didn’t get enough glue under a tile, hand weights are PERFECT to help setting them overnight.
As you can see – not done, still need the rest of the tile, trim, shelves and cupboard, but we are getting there. The other “thing” we realized was the ‘old’ smell – remember this house sat for almost 2 years, but as Chad took the doors off to sand and paint this week, he realized that the ‘old smell’ was in the wood….well enough said, new doors it is. By end of week, new doors will be installed too.
Well the best laid plans are not going to work with the house, not that we are surprised…but sometimes you just want it to go right so you can move onto the next project or just stand back and say “this project is complete”. So the tile I had picked out and bought for the 1/2 bath isn’t going to work as somewhere along the lines they moved the toilet and needless to say, WAY to much concrete patching work that any type of tile I thought I would go with would have made the tides coming in jealous. We had to go with plan B (thank goodness we didn’t make it to plan Z). We ended up with backer board or cement board anchored to the concrete so we had a level playing field (ha – floor). Here is what we have – not grouted yet, that is a quiet project Chad can do while I work this week.
While this was going on, of course, we cannot just sit and wait for glue/thin set mortar to dry, no, we have to keep destroying. So here is the laundry room… ready for destruction and then what we found (but this one we expected).
Gotta love the 80’s vinyl flooring…um, no! However, notice once again we have sheet rock down… the first weekend in the home, we noticed that the water pipes to the washing machine were leaking. Knowing we had a couple weeks before we were really ‘moved’ Chad fixed it enough so it wouldn’t leak, but not right. Hence we knew this would be part of the laundry room project so here it is… new pipes, valves and moving the dryer vent as naturally this is NOT set up the right way. Builders should really ask me how a washer and dryer should be put in correctly. (kidding!…but my way is right).
Not to think this was enough for the weekend, on one of our MANY trips to Lowes/Home Depot, Chad started the front sprinkers to find that one decided to break and cause a small water bubble under the grass – so we had to solve that real quick! I have 2 videos, but just found that this site doesn’t allow for videos to be posted. Ugh! If you want a good laugh, let me know and I’ll text them to you!