A new entry way…

Ok, so the entry way isn’t new, but it is going to feel like it is new by the end of next weekend. We scrapped the popcorn ceiling and textured it this weekend. By the end of next weekend, the ceiling and walls will be painted. I’m not going to press my luck by saying the crown molding will be up too, but I cannot wait to get rid of this icky yellow color! As you all have probably noticed the remodel slowed some over the past month or so. This is because I was working on starting a business. No, I’m still working at Optum but started a business where Chad will be my main employee and hopefully this will put less stress on his body. I’m calling it his retirement job! Check out the business at: http://www.acetechstx.com. Needless to say, we have a lot going on! If you come to this site and no update, know we are still working on the house, but may have had to delay as we are focusing on the business.

prepping…

more prepping, this one took a bit as we had to move the scaffolding a few times, but it is all done!

It’s been a few weeks…

We have been busy with “life” over the past few weeks but getting back to it. I think I last left with getting the door in Ciera’s room and crown molding up. We did get that all painted, the shutters in, and painted the closet. We have all of the new closet shelving to put up, but watching paint dry, is like watching a pot of water boil… Next weekend that will probably be the only thing accomplished as next Saturday we are going to a sandcastle competition. We are not competing, that would be hilarious but cannot wait to see what the competitors come up with. I hope all have had a great Easter! We did take some time to do our normal egg dying and Ciera and I are trying a new blue raspberry sparkling wine. Gotta say, it is good!

goodbye icky dirty walls!

One of those weekends

It was one of those weekends where you know you accomplished a lot, but when you are asked, you can’t remember exactly what all you did. That is how the weekend went for me. We did a lot of little things. We sold the cart, so now we have space again in the garage, planted most of the flowers in the front bed, painted Ciera’s ceiling and decided to put the ‘garage’ flowerpots on a different timer, which meant running new waterlines in the attic, punching out a new spicket out the garage and adding a timer. We also sat down to order the new AC/Heater individual units for the upstairs. We are taking out the new AC (don’t ask) and now each room upstairs will have their own units with individual temperature controls. That means there should be some fun coming in the next few weeks. Get exited!

These are rose trees in the back. They are to have burgundy and white roses; the front rose is pink.

Same pink roses at the back with a little gem magnolia tree. The pink and white daisies are yet to show up that will be in the middle and front.

water pipe that comes down from the attic, out the front side of the garage for the spicket for the flowerpots.

Doors and Flowers

This was a half-half weekend, meaning half of the work inside and half outside. We did get the door installed from Ciera’s room that will go out into the Atrium landing area. The ceiling in her room is primed and when Chad was doing that, thought he would just give it all a fresh coat of paint, so he is redoing the whole room. Whatever, silly boy. We also ordered the plants/flowers for the front flower bed which should come in this week. So excited as if it looks as good in person as I have in my head, I will be super happy! However, the flowerpots around the garage needed flowers, so found what we wanted for them and got those all planted too. Not a busy weekend, just steady.

See that pink – he is redoing it for whatever reason, but this is the door from Ciera’s room that will go out to the landing. If you look closely on the other side there is a hole in the wall, that was to mark where the door will go into the garage. Chad was going to punch out the wall this weekend but got him to wait until Ciera’s room is all done as then we can build the landing correctly and be able to stand on something really solid to put in the other door. We have to move some supports in the garage (and re-support it) so more than just a quick punch and hole and put in a door.

Atrium Fun

This weekend it was all about atriums! We started Saturday with going to a reptile convention to find an Egyptian Tortoise. Unfortunately, Ciera did not find her tortoise, so that search is still on. On Sunday, we spent an hour or so in the backyard tilling up Ciera’s garden and put down grass seed. Chad spent a little bit of time putting the finishing touches on the cart (he actually got it all running last weekend and I forgot to mention that). Now he can put it up for sale. Yahoo! Then it was time for demolition which is the most fun ever! We are putting in door from Ciera’s room into the atrium which we will build floor and put a door into the other side (which is the garage, so then you can walk into the garage which mean BIGGER HALLOWEEN (and more) DECORATIONS!!!! So excited!

This pic was when we moved in. If looking to the left is the garage and to the right is Ciera’s room that has a window.

Ciera’s window into the atrium.

Ciera doesn’t think this is safe – makeshift floor (only about 4×6). This is why I have life insurance on Chad. hee hee

Window is out and now we will cut it down about 4″ as that will match her floor and put in the door. We will naturally then have to add wall to the top. It is going to be awesome!

Back to the Pink Room (Ciera’s)

Ciera’s room was done minus the closet and getting the popcorn ceiling off. Naturally it makes it a lot easier when she isn’t under the roof to demolish her room. 🙂 We took this weekend to get the popcorn ceiling down and have the ceiling retextured. Depending on how the week goes we can start to prime or that will be next weekend’s adventure. Then we will move down the upstairs hall and entry way (removing popcorn ceiling) and once we paint the upstairs and stairway/entry way; the upstairs will be done. We also took a small amount of time to install new tanning bed bulbs which makes only me happy!

such thick popcorn

no more popcorn but included this for the slanted side. The original builders did not put any tape on the slants. Like, come on man!

new texture, now we wait for it to dry.

Kinda a weird weekend

That means, it was a perfect weekend for me! We sent our stuff in for our taxes, got the items under the stairs reorganized (it was a mess after the 2 holidays), got a consultation scheduled for new siding, and got the tree guy called to come make the front tree beautiful (needs trimming). We also fit in moving sprinklers (since we put in the landscaping bricks), the pots all put where they need to be, put down grass seed, and got the stair handrail and sides all caulked so I can paint them.

We’re back!

I know my last entry said we would be back in a week; well, it ended up being 2 weeks. I ended up scratching my cornea last week, so it was a very bad eye weekend last weekend and that meant if anything was going to get done, it was up to Chad. He did move some rock into the flower beds and this weekend, we only had Sunday to work, but were able to get the side boards installed on the steps and the new middle handrail to the steps. Slow weekend, but we are getting there one weekend at a time!

The middle handrail with the trim below and then this is one picture of the side stair board which naturally is on the other side and the other set of stairs that comes up.

My tree is gorgeous

We needed more landscape wire last weekend to get the lights put in the tree. I’m super happy to say that my tree is now gorgeous – for as much as a tree can qualify for being gorgeous. We were also able to get the mudding done on the handrails and got the stair side runners put in. We will be on break next weekend, so no update. Chad is getting his cortisone shot in his hand and I’m heading to New Orleans with Ciera for her birthday! We will be back the following weekend.

Happy 2023!

We were busy this weekend! First, I hope everyone had a great New Year’s and that you are off to a great 2023.

We normally take any of the construction debris to the landfill on Saturday and they charge $25 for a truckload. We didn’t quite have a full truckload, so we hurried up and got the carpet removed from the stairs, the handrails removed and what I’m going to call the middle wall wood removed. (Making a good truckload). You will see in the pictures below why I’m calling out the middle wall.

If you remember from an earlier post, right now we are to be working outside as it is great weather. After our destruction, we did move back outside. We were able to get all of the landscape lights wired in, we ordered the rock so almost ready to put out the planters and plant the new shrubbery. Then all we will have to do is paint the house and we should be completed outside (until we start on the pool).

Stairs before – take note of the handrail…behind the handrail is a 2×4 board that they nailed to the wall. I kid you not the nails they used were like railroad ties (damage they made to follow).

I’m so glad we know how to repair drywall…those nails were CRAZY! (See picture below too).

This is the middle wall. If you look at the top, they had sheetrock here, but then notched it out to make the decorative board work. (shake my head). Then if you look at the bottom, there is no sheetrock there. That’s ok construction folks, we will do your job right!