You know, things had been going really well with the remodel, so we should have known. Let me start with the good first. We were able to get the landing built outside of Ciera’s bedroom into the Atrium. We will be putting a door in the other side as that connects to the garage (meaning walk in garage = more Halloween decorations). Chad needs to texture; paint and we will put up railings which will hope to give a New Orlean’s feel. While we were cleaning up, we decided to pull up the floor under the landing as it was HORRIBLE, so walking on a little bit of concrete for a while would be much better. Well, that is what we thought. Upon pulling up the first plank of the floor, we see brick – same brick that is on the outside of the house. Then plywood floor but when you looked between the plywood and the brick, it appeared to be dirt. Sigh. Chad drilled a small hole to find they actually made a wood box to fill in the space. Well….we all know what is next on the list to be fixed correctly. We now know what we have waiting on the other side of the hall because when Chad remodeled the bathroom on that side, he claimed he could see brick. I doubted him but now know we have another mess on the other side. Here’s to no dull moment in this house!






































