And we are back at it…

I was still sore last weekend, so we didn’t get a lot accomplished and by the time I should have sat down to write the blog, my shoulder and arm were just over doing anything. However, I’m feeling much better now! Still have the tingling in a couple fingers, but I don’t feel like I can’t lift anything, so we jumped back into things this weekend. Chad worked most of the day Saturday, so pretty much Sunday work, but happy with the progress. Last weekend we got new wiring ran, decided to replace the old insulation and got the patio pad poured. This weekend, the sheetrock went up and we pulled down the temp wall that led into the hallway so we could put up sheetrock to close that off. We did take out some sheetrock on the wall that bumps up to the kitchen. I wanted to open up that wall – for an open floor design. We knew it was a load bearing wall, which meant we would have to reinforce it. What did we find instead… the upstairs sewage lines and water lines. That answers that question, that wall cannot be opened up. There is no way I’m up to messing with moving those lines. We have the kitchen and master bath water/sewage lines to play with, so I opted to give up that designing makeover dream (the opening of the kitchen to living room).

Next weekend we will be in San Antonio so I most likely won’t have an update. We do plan on working on both Dec 24-25 as Ciera is spending the weekend with us in San Antonio and therefore spending the holiday with her boyfriends family. I asked Chad what he wanted for his birthday (12/24) and what he wanted to do for Christmas, he said work on the house. So we will be working on the house. I’m dreaming of a completed remodel (like of I’m dreaming of a white Christmas). Look for an update then after Christmas!

patio pad poured. The new door is to be ready for pick up on 12/21!

New wiring on the wall that doesn’t have the black insulation. New insulation in this side wall and then replace what is on the back wall (got rid of the insulation in black).

This is the living room looking into the hallway – framing so we could put up sheetrock.

Sheetrock on the fireplace wall and the wall that will become the entertainment center.

This is the hallway looking into the living room (if you could see in there). What is the blue tape for? To help keep any dust from coming through until we are ready to tape it properly for mudding/texturing.

Crushed designing dream – not even going to try and move all of those lines to open up the wall between the living room and kitchen.