I know I said things would stop and go this year due to the wedding (which is fine) and that was this type of weekend. We had only 1 day of housework as 1 day was all about wedding invites. (meaning watch your mail) Basically, very happy to report both things are progressing well. LOL!

The shower ceiling has insulation, lights and start of sheetrock. We cannot build the outer shower wall until the shower pan kit arrives. Should be here on Wednesday (fingers crossed). The shower should be 4×7 but we need to have the pan down and built before we can do the wall (to ensure it is where it needs to be). I have some sample tiles for the shower and some samples for the bedroom wood floor on the way. I know seems weird as I need tile for the bathroom but need to know what I’m putting on the shower walls and bedroom floor so I can make sure the bathroom tile flows nicely with both.

You will see in the pictures, we still need to tear down the walls (as it still has the windows) but wanted to get the shower ceiling put in before tearing the walls down, otherwise it would be impossible to keep it cool.

We have the skylight covered at the moment, which will not stay, so if it looks funny, you are correct.
Had to include my new office clock! Ciera and Dylan gave this to me for Mother’s Day as my wall clock broke. This is perfect and it even lights up!